Water Resources Licensing & Regulatory Permitting Consultancy
PT WECON assists dam developers, industry, hydropower, and water infrastructure projects in preparing technical studies and securing Ministry of PUPR approvals — from BWS/BBWS technical recommendations to design certification and operation permits.
Our Core Permitting Services
Three pillar service clusters aligned with the latest Ministry of PUPR regulations, each supported by technical guides and 30+ years of field experience.
River Diversion Permit
↗River diversion licensing for business activities under PUPR Regulation No. 4/2024 — hydrology studies, HEC-RAS modeling, cofferdam design, and BWS/BBWS recommendations.
River Diversion Requirements & StepsWater Intake Permit & SIPPA
↗Surface Water Usage Permit (SIPPA / SIP SDA) assistance for industry, plants, mining, and hydropower — water balance study, intake design, and BWS recommendation hearings.
How to Apply for SIPPA & Water Intake PermitDam Construction Permit
↗Design Certification, Construction Permit, Impounding Permit, and Dam Operation Permit under PUPR Regulation No. 27/2015 with the Dam Safety Commission (KKB) hearings.
Dam Permitting Stages & RequirementsSupporting Technical Guides
Read our complete guides covering the legal basis, required documents, and procedures for each type of permit.
Discuss Your Water Permitting Needs
Our certified water engineers are ready to help you prepare technical documents and defend the technical recommendation before the River Basin Authority.