Merangin Hydroelectric Power Plant - Water Engineering Consultant

Merangin Hydroelectric Power Plant - Water Engineering Consultant

Property details

LocationKerinci, Jambi, Indonesia
Completed InTargeted 2024
ServicesProject Management Consulting
ClientPT. Kerinci Merangin Hidro
Project StructureConcrete Gravity Dam (62.5m height)
Visibility SettingsPublic
Services ConsultantPT. WECON

The Merangin Hydroelectric Power Plant utilizes Lake Kerinci as an annual natural storage, paired with the Sanggaran Agung Regulatory Dam functioning as a regulating dam with a height of 9 meters. Additionally, the daily artificial storage is achieved by utilizing the Kerinci Dam—a robust concrete gravity dam type standing at a height of 62.5 meters.

To ensure seamless execution, PT. WECON contributes as the primary Project Management Consultant and Water Engineering Consultant. We actively bridge the communication and technical alignment between the job owner, PT. Kerinci Merangin Hidro, and the main contractor, PT. Bukaka Utama Teknik. This large-scale hydroelectric power plant is targeted to become fully operational in 2024, providing sustainable energy to the region.

"By acting as the central project management and water engineering consultant, we bridge complex civil contracting with the client's strategic vision to deliver sustainable energy."

Ir. Hadi Santoso, MT

Ir. Hadi Santoso, MT

President Director, PT. WECON

Gallery image 1
Gallery image 2
Gallery image 3
Gallery image 4